PROJECT PHOTOS OF INTERNAL STRUCTURE SEPTEMBER '98


The masons work on the interior walls that surround the gymnasium.
The metal railings have been welded into place.
 
This expansion joint in the water pipes help to control the pressure in the pipes.
A close-up of the water pipe elbow joint. 
 
 
 
 
The door frames have been set in place in preparation for the wall installation. 
 
 
 
 
 
Go Back