PROJECT PHOTOS OF EXTERNAL STRUCTURE SEPTEMBER '98


The structure from the rear of the building.
The masons have their materials stock piled in preparation for their tasks. 
 
The gymnasium steel has been erected and is being prepared for the masonry walls to be put up. 
The walls on the north side of the school have been laid with waterproofing material and are being prepared for the masonry. 
 
 
 
    The masonry walls are tied together with several different kinds of ties, one of them displayed here. 
 
 
 
 
 
 