The structure from the rear of the building.
|
 |
|
The masons have their materials stock
piled in preparation for their tasks.
|
The gymnasium steel has been erected
and is being prepared for the masonry walls to be put up.
|
 |
 |
The walls on the north side of the school
have been laid with waterproofing material and are being prepared for the
masonry.
|
The masonry walls are tied together
with several different kinds of ties, one of them displayed here.
|
 |