INTERIOR STUCTURE NOVEMBER'98


The placing of the insulation is being completed in the gymnasium. 
This picture displays the steel connection between the bowstring trusses and other supportive members in the gymnasium. 
 The masons have their materials stock piled on the gym floor in prepartion for the completion of the masonry block placement. 