Loam stockpiling
|
![]() |
![]() |
Loam stockpiling |
"650G Dozer" - stockpiling loam | ![]() |
![]() |
"650G Dozer" - stockpiling loam |
"D8R Dozer" and
truck - stockpiling loam
|
![]() |
![]() |
"Trailer Dump Truck" - temporary haul road |
"650G Dozer" - temporary haul road | ![]() |
![]() |
"650G Dozer" - temporary haul road |
"SD100D Roller" - temporary haul road | ![]() |
![]() |
Structural fill for building site |
Structural fill being spread on building site | ![]() |
![]() |
Surveyor measuring elevations for structural fill |
Cleared area with structural fill | ![]() |
![]() |
Cleared area with structural fill |
Structural fill defines the area where the school building is going to be | ![]() |
![]() |
Rock boulders to be buried |
"790 D Excavator" burying rock boulders in site | ![]() |
![]() |
"790 D Excavator" burying rock boulders in site |
"790 D Excavator" burying rock boulders in site | ![]() |
![]() |
"790 D Excavator" burying rock boulders in site |