The oil tank is now underground.
|
 |
|
Metal guard rails have been installed
on the west side wall.
|
Site work has decreased, as the
fields have been set to grade and the ground will soon freeze.
|
 |
 |
The driveway leading to the school has
been paved and there is temporary fence located at the entrance.
|