INTERIOR STUCTURE DECEMBER'98


 Workers use hydraulic lifts to complete the placing of the insulation. 
The masonry in the gymnasium has been completed and mechanical workers now occupy the gym. 
 Workers prepare to lift this unit heater into place in the gymnasium.
The units on the left are the vibration isolators for the fuel oil pumps on the right. 
Temporary heaters arrived on site in preparation for the winter months.
Workers assemble the refrigeration equipment that arrived on site in mid December.