The more accurate the estimates, the more prepared the owner will be for expected expenses, hence, fewer the consequences on the schedule.
‘The indirect costs may be included as part of the code of accounts for a
project. One method to estimate the indirect costs is to assign a cost to each
cost account. This must be based on the size and type of contract and
could be a lengthy list. This method requires a great deal of experience
and a working knowledge of the construction firm's experience.’